I wanted to challenge myself to do Dassault Systèmes's 21 years of Model Mania by completing the designs from each year (2000-2020) in 21 days. I recorded the time it took to complete each model
Model Mania can be found at https://blogs.solidworks.com/tech/2020/03/20-years-of-model-mania.html
Phase 1 took 30 minutes, and phase 2 took about 10 minutes. This was a fairly easy part
Phase 1 took 43 minutes, and phase 2 took 18 minutes. This is the first Model Mania year where the simulation portion was included on the 2D drawings
Phase 1 took 38 minutes, and phase 2 took 12 minutes. Phase 2 required a simple simulation
Phase 1 took me 28 minutes, and phase 2 took 16 minutes. This part was made with just 1 extrusion and 1 extruded cut with fillets. Phase 2 required editing the top profile
Phase 1 took about 30 minutes, and phase 2 took 20 minutes. Phase 2 required an extra part to be added
Phase 1 took 30 minutes, and phase 2 took 20 minutes. This was similar to 2010 model
Phase 1 took 32 minutes, and phase 2 took 22 minutes